The LOD discussion (debate?) continues...
Senin, 26 Agustus 2013
0
komentar
practical BIM: LOD, are we there yet
...using BIM for the creation of construction documentation is a valid use, and one that needs to be encouraged
All Things BIM: LOD Reply: PracticalBIM
The simple answer starts with an equation:
Deliverables = Model + x
In this equation, x refers to anything else that might accompany a model being offered as a project deliverable. This might include drawings, specifications, napkin sketches, and so on. The LOD Specification addresses ONLY the "model" part of the equation - it does not serve as a guide to complete project deliverables in current work flows.And:
BIM Fix Blog: Developing LOD (Level of Development)
LOD should never be seen as the design is complete, or “design sign off”. Just because an element is; e.g. LOD 300, does not mean it will not change. We are in a design and construction environment. Design changes, coordination, rationalisation, value engineering & preferred construction methods, will all influence the element’s size, shape, location, and orientation. Design sign-off will continue to have the traditional design stage mile-stone approvals (e.g. Design Development and Construction Documentation)
Heads-up:
Great conversation happening “@jvandezande: @fedenegro @theBIMForum #LODSpec Reply to practicalBIM blog post. http://t.co/p0BimxU27p”
— Federico (@fedenegro) August 25, 2013
TERIMA KASIH ATAS KUNJUNGAN SAUDARA
Judul: The LOD discussion (debate?) continues...
Ditulis oleh Unknown
Rating Blog 5 dari 5
Semoga artikel ini bermanfaat bagi saudara. Jika ingin mengutip, baik itu sebagian atau keseluruhan dari isi artikel ini harap menyertakan link dofollow ke https://androidtv7.blogspot.com/2013/08/the-lod-discussion-debate-continues.html. Terima kasih sudah singgah membaca artikel ini.Ditulis oleh Unknown
Rating Blog 5 dari 5
0 komentar:
Posting Komentar